UTICA BOILERS CuB Series Manual de instalación Pagina 2

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 2
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 1
11.
Remove any call for heat or hot water.
12.
Turn gas and electric power ON.
13.
Power up boiler.
14.
Congure control for proper boiler size and type.
15.
To access the Parameter “tS” menu:
Press and hold Reset button for 10 seconds, display
will read “tS”, release button.
Press the Reset button for 1 second, display will read
“P01”.
Press Heating buttons to scroll the list of parameters.
Press DFHW buttons to view or change a parameter.
Two Parameters need to be set “P01 & P02” as shown
in gure 4.
16.
To access Conguration menu:
Press DHW + & - (both) buttons and hold for 10
seconds; “b01” will appear ashing.
Press Heating buttons to scroll Conguration list.
Press DHW buttons to view or change a setting.
Conguration “b01” is only one to be changed per
chart in Figure 6.
When proper size is selected, press and hold DHW
+ & - (both) buttons for 10 seconds to exit, or turn
power off then on, or wait two minutes for auto exit.
Boiler is now ready for operation
17.
Verify proper operation by following START UP
PROCEDURE in Installation, Operation & Maintenance
Manual.
18.
Install front jacket casing following instructions found in
Installation & Maintenance Manual.
CONTROL BOARD REPLACEMENT KIT
Parameter Description Setting
b01
Curve
Selection
Default =2
b01
CHB-100 0
b01
CHB-130 1
b01
CCB-150 2
Figure 4 - Enter Conguration Menu
CH
DHW
Figure 6 - Proper Size Settings
Figure 4 - Enter Parameter "tS" Menu
tS Menu CCB-150 CHB-100 CHB-130
P01
Gas
Type
0=Natural
Gas; 1=LP
Gas
0=Natural
Gas; 1=LP
Gas
0=Natural
Gas; 1=LP
Gas
P02
Boiler
Type
1 2 2
Vista de pagina 1
1 2

Comentarios a estos manuales

Sin comentarios